Siva Prasad BNV
VIDWAN ID: 495734

Dr Siva Prasad BNV

Male Doctor of Philosophy
Assistant Professor (Grade-II) | Department of Mining Engineering
Indian Institute of Technology (Banaras Hindu University), Varanasi
Uttar Pradesh
Expertise: Mining and Mineral Processing
4 Publications
59 Projects
21 Scopus Citations
16 CrossRef
13 Years 2 Months Total Experience
Publications
4 Total
Articles
2
Chapters
1
Proceedings
1
Activity

No publication activity to display.

Scopus Scopus
21 Citations
3 h-index
CrossRef CrossRef
16 Citations
2 h-index
Google Scholar Google Scholar

Loading Scholar statistics...

Professional Recognition

No Data Found

There is currently nothing to display here.

Community & Membership

No Data Found

There is currently nothing to display here.

International Society for Rock Mechanics
Individual
Jan 2023
The Institution of Engineers (India)
Member
Jan 2022
Mining Engineer’s Association of India
Life Member
Jan 2022

Personal Details

Doctor of Philosophy
2022
N/A
Bachelor of Technology
2013
Rajiv Gandhi University, Itanagar
Assistant Professor (Grade-II)
Feb 2024 – Present
Indian Institute of Technology (Banaras Hindu University), Varanasi | Department of Mining Engineering
Scientist C
Apr 2021 – Feb 2024
Geological Survey of India
Scientist B
Apr 2016 – Apr 2021
Geological Survey of India
Assistant Manager
Jul 2013 – Apr 2016
HINDUSTAN ZINC LIMITED
Engineering and Technology
Mining and Mineral Processing

Related Profiles

Scholarly Work

Mine and Dump Slope Stability Analysis for Lloyds Metals & Energy Ltd
Completed
Role: Principal Investigator
Assessment of Granite Building Stone Quarry of Thomas O D at Re Survey Nos: 234/1 in Wayanad District
Completed
Role: Principal Investigator
Scientific Study for Prediction of 3D Subsidence of 373.2 Ha of land (206.826 Ha Forest Land) of Tandsi Underground Mine
Completed
Role: Principal Investigator
Scientific Studies to Assess the stability of Drives through Paste fill Rampura Agucha Underground Mines
Other
Role: Other
Scientific Studies for Evaluation of Stope and Pillar Stability vis
Other
Role: Other
Design of ground Support Below -233 mRL upto -533mRL at Rampura Agucha Underground Mines
Other
Role: Other
Scientific studies to Design Geotechnical Instrumentation Plan at Rampura Agucha Underground Mines
Other
Role: Other
Audit of ground Control Management Plan of Rampura Agucha Underground Mines
Other
Role: Other
Audit of ground Control Management Plan of Zawar Group of Mines
Other
Role: Other
Development of Geotechnical Instrument Network for C#3 package of PHPA-II Hydroelectric Project
Other
Role: Other
Laboratory Geotechnical Investigations on Jointed Rock Samples from Punatsangchhu-II Hydroelectric Project
Other
Role: Other
3D Numerical Modelling Studies of Powerhouse Complex at Punatsangchhu-II Hydroelectric Project
Other
Role: Other
Determination of In-situ stress regimes at the Downstream surge gallery of Punatsangchhu-II Hydroelectric project
Other
Role: Other
Analysis of Instrumentation data and assistance in installation and monitoring of Instruments at C#3 Package of Punatsangchhu-II hydroelectric Project
Other
Role: Other
Failure Analysis of CP-03A Stope and Evaluation of Extraction Sequence of Different Stopes in C-Block at Sindesar Khurd Mines
Other
Role: Other
Review and determination of alarming limits for surface subsidence through numerical modelling at Rajpura Dariba Mines
Other
Role: Other
Scientific Study for Prediction of 3D Subsidence of 373.2 Ha of land (206.826 Ha Forest Land) of Tandsi Underground Mine
Other
Role: Other
Scientific Studies to Assess the feasibility of Underground mining methods at Rampura Agucha Underground Mines
Other
Role: Other
Stability Analysis of Butterfly Valve Chamber using 3D Numerical Models at Mangdhechu Hydroelectric Project
Other
Role: Other
3D Numerical Model Studies for Stress Analysis of Underground Powerhouse Complex and Underground Surge Shaft of Naitwar Mori Hydroelectric Project
Other
Role: Other
Analysis of instrumentation data and assistance in installation & Monitoring of Instrumentation at C-3 package of Punatsangchhu-II Hydroelectric Project Bhutan
Other
Role: Other
Establishing the dimensions of caprock and estimating the stoping parameters for K Series and Northern series of lenses at North Baroi Mine
Other
Role: Other
Assessment of stability of the mine pertaining to extraction of an Ore block at Baroi Mine
Other
Role: Other
Scientific study to assess the stress and displacement limits at Zawar Mines
Other
Role: Other
Geotechnical instrumentation installation and monitoring at Kaleswaram Project-Package-11
Other
Role: Other
3D numerical modelling analysis for the pump house and surge pool caverns of Pranahita-Chevella Sujala Sravanthi Lift Irrigation Scheme Package-8
Other
Role: Other
Support design of underground surge pool and pump house by 3D Numerical Modelling of Pranahita-Chevella Sujala Sravanthi Lift Irrigation Scheme (PCSSLIS) Package-11
Other
Role: Other
Pit slope stability analysis of North East benches of A Narrain Mines
Other
Role: Other
To carry out rock mechanics investigations
Other
Role: Other
Assessment of Granite Building Stone Quarry of Thomas O D at Re Survey Nos: 234/1
Other
Role: Other
Mine and Dump Slope Stability Analysis for Lloyds Metals & Energy Ltd
Other
Role: Other
Geotechnical Mapping and Numerical Modelling of Underground Workings at Malanjkhand Copper Project
Other
Role: Other
Numerical Modelling Studies for Optimisation of of Mining Parameters at Ambaji Underground Mine of GMDC Ltd. Gujarat
Other
Role: Other
Numerical Modelling Studies for Optimisation of Mining Parameters at the Open Cast Mines (Kadipani fluorspar and Kadipani Expansion project) of GMDC Ltd. Gujarat
Other
Role: Other
Design Review and Audit of Under Construction Railway Tunnels in Dimapur-Kohima Railway Line
Other
Role: Other
Analysis of geotechnical and geodetic instrumentation data at C3 package of Punatsangchhu-II Hydroelectric Project (2023-2024
Other
Role: Other
3D numerical modelling studies of powerhouse complex for Lakhwar multipurpose project (300MW
Other
Role: Other
Monitoring of permanent DGPS points established on spillway blocks 35
Other
Role: Other
Analysis of geotechnical and geodetic instrumentation data at C3 package of Punatsangchhu-II Hydroelectric Project (2022-2023
Other
Role: Other
Geodetic monitoring of Sardar Sarovar Dam
Other
Role: Other
3D numerical modelling of Vishnugad Pipalkoti powerhouse complex _ Analysis with different geological and geotechnical parameters
Other
Role: Other
3D slope stability analysis of already excavated slopes of plunge pool area of Koldam HPP
Other
Role: Other
Deformation monitoring of underground riverbed powerhouse cavern of Sardar Sarovar Project
Other
Role: Other
3D numerical modelling of underground powerhouse complex and surge shaft for Reoli Dugli Hydroelectric Project (456 MW
Other
Role: Other
Design Methodology - Railway Tunnels between Trivandrum and Kanyakumari
Other
Role: Other
Networking and Analysis of Instrumentation Data at Dam Complex
Other
Role: Other
Geotechnical Mapping
Other
Role: Other
Analysis of Cavity Monitoring System Data for the Void above Downstream Surge Chamber at C-3 Package of PHPA-II
Other
Role: Other
Establishment of Permanent DGPS Points on spillway blocks 35
Other
Role: Other
Stability analysis of crane beam rock ledge using 3D numerical modelling at Palamuru Ranga Reddy Lift Irrigation Scheme-1
Other
Role: Other
Geodetic Monitoring of Sardar Sarovar Project for the Year 2021-2022
Other
Role: Other
Analysis of Instrumentation Data and Guidance during Installation & Monitoring of Instruments in powerhouse complex (C-3 Package) of Punatsangchhu-II Hydroelectric Project
Other
Role: Other
3D Numerical Modelling of Powerhouse Complex for Sunni Dam Hydroelectric Project (382 MW
Other
Role: Other
Analysis of instrumentation data at Dam Complex
Other
Role: Other
CapRock Stability at Central Baroi Mine vis-a-vis Depillaring of Remnant Pillars _ A Critical Appraisal
Other
Role: Other
Analysis of Cavity Monitoring System Data for the Void above Downstream Surge Chamber at C-3 Package of Punatsangchhu-II Hydroelectric Project
Other
Role: Other
Analysis of Geotechnical & Geodetic Instrumentation Data at C-3 Package of Punatsangchhu-II Hydroelectric Project
Other
Role: Other
3D Numerical modelling of powerhouse complex & surge tank for Vishnugad Pipalkoti Hydroelectric project
Other
Role: Other
Analysis of instrumentation data and guidance for installation and monitoring of instruments at C#3 package of Punatsangchhu-II Hydroelectric Project
Other
Role: Other
No Data Found

There is currently nothing to display here.

No Data Found

There is currently nothing to display here.

Scholarly Publications

Compendious Index for Drillability: a rapid tool to assess drill penetration rate and bit life for rock engineering applications

Journal Article
Bulletin of Engineering Geology and the Environment. Year: 2023. Volume: 82 , Issue: 3 , Pages: 79 .
Authors: B. N. V. Siva Prasad; V. M. S. R. Murthy; Sripad R. Naik

Influence of Static and Dynamic Rock Properties on Drillability Prognosis for Mining and Tunnelling Projects

Journal Article
Indian Geotechnical Journal. Year: 2022. Volume: 52 , Issue: 4 , Pages: 765-779 .
Authors: B. N. V. Siva Prasad; V. M. S. R. Murthy; Sripad R. Naik

Challenges in Drill Equipment Selection vis-à-vis Underground Excavations – A Methodology

Book Chapter
Year: 2022. Pages: 167-182 .
Authors: B. N. V. Siva Prasad; V. M. S. R. Murthy; Sripad R. Naik

Planning for geotechnical and geodetic instrumentation in underground caverns

Conference Paper
Year: 2018.
Authors: Siva Prasad, B.N.V.; Naik, S.R.